CEMS Application RFQ




Figure 2




All fields marked with (*) are required

CONTACT INFORMATION
*
*
*
*
*
MONITORING POINT INFORMATION
*
Does the monitoring point have an ESP or Baghouse?
If yes is monitoring point Upstream or Downstream of ESP or Baghouse?
Is the monitoring point Downstream of wet scrubber?
Is the monitoring point Downstream of ammonia injection?
STACK GAS DATA - GAS COMPOSITION
PROCESS PARAMETERS
STACK PHYSICAL DATA - CEMS SAMPLE PROBE
Bolt Pattern: Do the holes straddle top dead center - if no please email sketch. (Figure #2 above)
STACK PHYSICAL DATA - CEMS VELOCITY PROBE
Bolt Pattern: Do the holes straddle top dead center - if no please email sketch. (Figure #2 above)
Is the velocity probe located 8 stack diameters upstream and 2 stack diameters downstream from any flow disturbance? (Please email velocity profile if available)
Does the stack have an outer shell?
ANALYZER LOCATION - AMBIENT CONDITIONS
Pressure units
ANALYZER LOCATION - AREA CLASSIFICATION
Analyzer

Sample Point

Shelter Interior

Shelter Exterior

HEATED SAMPLE LINE
UTILITIES AVAILABLE
UPS Available?